000 | 02008nam a22003497a 4500 | ||
---|---|---|---|
999 |
_c6296 _d6296 |
||
005 | 20181001124405.0 | ||
008 | 181001b ||||| |||| 00| 0 eng d | ||
010 | _a 2012360617 | ||
015 |
_aGBA929075 _2bnb |
||
015 |
_a014-92888 _2bnb |
||
015 |
_aGBA-92907 _2bnb |
||
016 | 7 |
_a014928885 _2Uk |
|
020 | _a9780444532107 | ||
020 | _a0444532102 | ||
035 | _a(OCoLC)ocn262892616 | ||
040 |
_aBTCTA _cLC |
||
042 | _alccopycat | ||
050 | 0 | 0 |
_aTN871.2 _b.B45 2009 |
100 | 1 | _aBellarby, Jonathan. | |
245 | 1 | 0 |
_aWell completion design / _cby Jonathan Bellarby. |
250 | _a1st ed. | ||
260 |
_aAmsterdam, Netherlands ; _aBoston, Mass. : _bElsevier, _c2009. |
||
300 |
_axiii, 711 p. : _bill. (some col.) ; _c25 cm. |
||
490 | 1 |
_aDevelopments in petroleum science, _x0376-7361 ; _vv. 56 |
|
504 | _aIncludes bibliographical references and index. | ||
505 | 0 | 0 |
_g1. _tIntroduction -- _g2. _tReservoir Completion -- _g3. _tSand Control -- _g4. _tLife of Well Operations -- _g5. _tTubing Well Performance, Heat Transfer and Sizing -- _g6. _tArtificial Lift -- _g7. _tProduction Chemistry -- _g8. _tMaterial Selection -- _g9. _tTubing Stress Analysis -- _g10. _tCompletion Equipment -- _g11. _tInstalling the Completion -- _g12. _tSpecialist Completions. |
520 |
_aCompletions are the conduit between hydrocarbon reservoirs and surface facilities. They are a fundamental part of any hydrocarbon field development project. The have to be designed for safely maximising the hydrocarbon recovery from the well and may have to last for many years under ever changing conditions. Issues include: connection with the reservoir rock, avoiding sand production, selecting the correct interval, pumps and other forms of artificial lift, safety and integrity, equipment selection and installation and future well interventions-- _cSource other than Library of Congress. |
||
650 | 0 | _aOil well completion. | |
830 | 0 |
_aDevelopments in petroleum science ; _v56. |
|
856 | 4 | 2 | _3Publisher description |
942 |
_2lcc _cBK |