000 03926nam a22002897a 4500
999 _c7929
_d7929
003 OSt
005 20190711062427.0
008 190711b ||||| |||| 00| 0 eng d
010 _a 2002001080
020 _a0814407366
040 _aDLC
_cDLC
_dDLC
042 _apcc
050 0 0 _aTS192
_b.G76 2002
082 0 0 _a658.2/02
_221
100 1 _aGross, John M.
245 1 0 _aFundamentals of preventive maintenance /
_cJohn M. Gross.
260 _aNew York :
_bAmerican Management Association,
_cc2002.
300 _axiii, 223 p. :
_bill. ;
_c24 cm. +
_e1 CD-ROM (4 3/4 in.)
500 _aIncludes index.
505 8 _aMachine generated contents note: Foreword and Acknowledgment The Best Way to Read This Book Chapter 1. Getting Started Taking Stock of Your Situation 1 Do You Need a Computer to Effectively Conduct Daily Maintenance and PM Activities? 2 Changing Your Plant's Concept of Maintenance and Employing Total Productive Work 5 What Are the Magic Steps to Implementing the Program? 7 Planning for Success Summary Chapter 2. Establishing Scheduling Why Do I Need to Schedule? Establishing the Concept of Productive Work How Do I Get Started? What Do I Do with Work orders Once They're Completed? Do Not Let the Workorder Scheduling System Crash and Bum Summary Note Chapter 3. Breaking Your Facility into Logical Parts Define "Logical Parts" How Do I Start the Process? What Do I Do if I Maintain Buildings Instead of Plants? Summary Test Time Chapter 4. Developing an Equipment List Creating the Master Equipment List's Structure Using Equipment Type Let's Name Everything! Creating the Master List Putting Equipment Numbers on Equipment Summary Test Time Chapter 5. Writing PMs Eat the Elephant One Bite at a Time Elements of a PM Procedure Writing Good Instructions Turning the Draft into Final PM Workorders Scheduling PMs Quality Assurance of PM Write-Ups Summary Test Time Chapter 6. Developing Equipment Manuals Why Do We Need Manuals? How Do We Create These Manuals? Where Do We Get the Material for These Manuals? What Goes in the Manual Under the "Other Significant Items" Heading? What Are Troubleshooting Guides? Reviewing, Editing, and Maintaining the Manuals Summary Chapter 7. Setting Up Inventory A Quick Review of Inventory Management Inventory Management Steps How Do I Add New Parts? What About Items That Never Get Used? How Will Inventory Management Improve Uptime? Summary Chapter 8. Maintaining the System Why Does the World's Greatest Maintenance Management System Fail? Maintaining Your Quality Level Keeping the PM Workorders Current What About Parts? Making Continuous Improvements (or Like a Shark, Move Forward or Die) Learning from Your Failures More About CMMS Programs Summary Test Time Chapter 9. Planning for Success Who Will Build the PMs and the Inventory? What About the Long-Term Resources? How Long Will This Take? I'm in a Hurry! Summary Chapter 10. Conclusion Appendix 1 Abbreviations List Appendix 2 Generic Equipment List Appendix 3 PM Procedure Worksheet Appendix 4 Blank Forms Work Performed Without a Workorder Workorder, 8/2 X 11 Basic Workorder, 8/2 X 11 Coordination Workorder, 8/2 X 11 Drawing Workorder, 4 X 8 Size (Short Form) Troubleshooting Guide Form PM Quality Assurance Form Parts Requisition Form, 8'/2 X 11 Size Parts Requisition Form, 4 X 8 Size (Short Form) Daily Shift Log Action Plan Appendix 5 Test Time Answers Appendix 6 Managing the System Without a Computerized PM Program 193 Appendix 7 Summary of Helpful Tips 197 Index 219 About the Author 223.
650 0 _aPlant maintenance.
856 4 1 _3Table of contents
_uhttp://www.loc.gov/catdir/toc/fy033/2002001080.html
906 _a7
_bcbc
_corignew
_d1
_eecip
_f20
_gy-gencatlg
942 _2lcc
_cBK